From project design, training of new install team through to structure being complete this was done within one month.
Week 1 - High level requirements and basic configuration agreed, some training done at the factory for the install team
Week 2 - Drawings done and modifications done by customer
Week 3 - Finalisation of drawings for manufacture, manufacture completed over 3 days (with cut outs for doors and windows done at the factory)
Week 4 - Install wall and ceiling panels, and concrete applied
We know you are under pressure to reduce construction costs and build time, while also building in a more sustainable way. Our building system will provide you with greater speed of construction, a lower carbon footprint and better value than traditional bricks and mortar, steel, or timber frames. So, why not change the way you build today?